Road Work on Iowa 9 Continues

Beginning on Tuesday, Sept. 2, until late September, weather permitting, crews will begin the second stage of a concrete pavement replacement project. Crews will start west of Kirkwood Avenue and work east to the west side of the entrance to Street Chiropractic. Iowa 9 will be closed within the work zone. Message boards will be in place to provide you with advanced notice of the road closure.
The contractor will be placing dumpsters on each end of the work zone for garbage collection. Residents and the postmaster will be notified prior to work beginning. The contractor will also be available to answer any questions about the project.
When Iowa 9 is closed, through traffic will follow a marked detour route using Mitchell County Road T-26 and U.S. 218.
The Iowa DOT reminds motorists to drive with caution, obey the posted speed limit and other signs in the work area, and be aware that traffic fines for moving violations are at least double in work zones. As in all work zones, drivers should stay alert, allow ample space between vehicles, and wear seat belts.
Stay Connected with Mix 107.3 KIOW
Add Mix 107.3 KIOW as a preferred source on Google to see more local news, weather, and sports in your feed.
Follow us on Facebook for breaking news, severe weather alerts, sports, and more.


