Algona Runway Project Gets Underway
The Algona Municipal Airport’s concrete runway has closed this week for a project to address potential safety issues flagged by the Federal Aviation Administration. An FAA Flight Obstruction study identified U. S. Highway 18 as an obstruction to planes approaching from the north. Barb Smith, Algona’s Deputy City Administrator, says the south end of the runway is being extended by 240 feet.
The construction is expected to take four months, but weather could cause delays.
New lighting that helps pilots see the approach path to the concrete runway is being installed. Smith says the Algona airport’s grass runway is still open and can handle all the planes that typically land on the concrete runway.
The Algona Airport is two miles west of the intersection of U. S. Highways 18 and 169 and it can accommodate small and mid-sized jets. According to a 2022 report from the Iowa DOT, Algona’s airport has over 2,500 visitors and generates $5 million in economic activity each year.
Stay Connected with Mix 107.3 KIOW
Add Mix 107.3 KIOW as a preferred source on Google to see more local news, weather, and sports in your feed.
Follow us on Facebook for breaking news, severe weather alerts, sports, and more.


